Entering overhead and profit rates for bid items

Note: This functionality is available only if you have the Estimating Module.

Note: Sage 100 Contractor updates all bid items in the takeoff with the indicated rates.

To enter overhead and profit rates for bid items:

  1. Open a takeoff in 9-5 Takeoffs.
  2. Next to the Bid Item list, click the detail button.
  3. In the Overhead column, enter the overhead rate for each cost type.
  4. In the Profit column, enter the profit rate for each cost type.
  5. Click Save.